GEMİSÖK Kılavuz

Aliağa Gemi Söküm Yönetim Sistemi — Kullanım Kılavuzu

Kullanıcı Aletleri

Site Aletleri


en:operasyon

Operations / Production

🇹🇷 Türkçe · ← Guide home

What it does: Planning of the daily dismantling operation, block/piece tracking and production records.

Steps

  1. Plan shifts and crews.
  2. Record cut blocks/pieces and tonnage.
  3. Log equipment usage and downtime.

Occupational Health and Safety Law (6331).

Local source (PDF):

en/operasyon.txt · Son değiştirilme: Değiştiren: 127.0.0.1