GEMİSÖK Kılavuz

Aliağa Gemi Söküm Yönetim Sistemi — Kullanım Kılavuzu

Kullanıcı Aletleri

Site Aletleri


en:saha-tasima

In-Site Transport

🇹🇷 Türkçe · ← Guide home

What it does: Planning of moving cut blocks/materials within the site by machinery/crane, and equipment eligibility.

Steps

  1. Define the transport task and route.
  2. Assign eligible (inspection-valid) equipment.
  3. Post moved tonnage to production.

Ship Recycling Regulation art.12; Work Equipment Regulation.

Local source (PDF):

en/saha-tasima.txt · Son değiştirilme: Değiştiren: 127.0.0.1